When HSP Architects and Price & Myers wanted to transform a listed commercial basement in Temple Fortune to create a new community centre, they needed to look no further than Newton Specialist Contractor Arti Construction to perform the waterproofing.
The basement, part of a four-storey Listed building, was built into a hillside, meaning that three of the walls were either fully or partially below-ground and suffering from water penetration. Arti Construction worked with the design team at an early stage to design a waterproofing solution.
With existing Listed basements such as this one, Arti Construction were quick to recommend a Type C cavity drain waterproofing solution in the form of the Newton CDM System. Type C waterproofing is the safest and most reliable form of waterproofing that will deliver a completely dry internal space, whilst also causing the minimum amount of disruption to the Listed structure.
Before Arti could proceed with the installation, they first had to re-level the existing concrete slab in order to provide a flat and stable floor.
With the structure fully prepared, Arti could then proceed with installing a full cavity drain waterproofing system. This consisted of installing Newton 508 with minimal MultiPlug fixings to the walls and floors to capture the ingressing water. The water is then directed via Newton Basedrain channels to a Titan-Pro sump chamber, for removal by dual NP400 clean water pumps.
The complex basement space included existing columns, windows and an internal staircase which all had to be factored into the waterproofing design.
Regardless of this, Arti Construction completed the 280m2 installation within budget in just one week, delivering a reliable Type C structural waterproofing system that is also compliant with British Standard 8102:2009.
We were extremely pleased to get involved at an early stage as a key member of the design team working alongside HSP Architects and Price & Myers on delivering this important new centre in Temple Fortune. Our company approach is built around delivering perfection and reliability for our clients, so working with Newton and using their high quality products ensures that we can do this. Lucian Ardeleanu, Managing Director, Arti Construction Ltd.
Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.
We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.