Summary

Internally and externally waterproofing the below-ground developments of the extended Christian Dior store on New Bond Street, with Newton 403 HydroBond, Newton 107F and Newton System 500.

The Project

New Bond Street has been one of the most prestigious retail streets in London since it’s 18th Century beginnings, and in 2011 was named as the second most expensive retail street in Europe after the Champs-Élysées in Paris. The Christian Dior name has also been synonymous with haute couture and luxury retail since its own inception in 1947.

This project required both the internal and external waterproofing of the extended basement area of Christian Dior’s flagship London store. A significant extension of the existing floor space on this stretch of famous London road, the extensive basement area will be used as stock rooms, changing rooms, and staff and shop floor areas. It was therefore a crucial requirement to achieve a completely dry internal space.

The Solution

The property line construction between two existing buildings meant that there was a requirement for waterproofing both new and existing structural elements, including pile caps, underpinning, a new reinforced concrete slab, existing foundations, and also existing vaulted areas at the front of the building which extend below New Bond Street.

Because a completely dry internal environment was required, (defined as Grade 3 by the BS 8102:2009 Code of Practice for The Protection of Below Ground Structures From Water From The Ground) the proposal put forward by design specialists G05, in consultation with Newton, was a combination of Type A and Type C waterproofing systems. Due to the fact that the build was between the flank walls of two existing structures, the Type A system comprised of a combination of the hydrophilic, fully-bonded Newton 403 Hydrobond membrane pre-applied below the new concrete slab, and was linked to the cementitious, flexible Newton 107F membrane, which was applied to the internal faces of the walls and the prepared internal areas of the vaults.

Following the application of the Type A system, a Newton System 500 Cavity Drain membrane system (Type C) was applied to the internal wall and floor areas by Newton Specialist Basement Contractor Advanced Preservations Ltd, who also guaranteed the work. The system included perimeter drainage using Newton Basedrain, and two Newton Titan-Pro pumping systems. The under-pavement vaults were lined internally with the Newton 500 system.

The Result

Not only was continuity achieved with the waterproofing systems across numerous below-ground building mediums and scenarios, but the waterproofing system also conformed to the recommendations of BS 8102:2009 for combined waterproofing protection, where even the slightest form of water ingress is unacceptable.

The internal areas were also successful in achieving an environmental Grade 3 with regard to their degree of water tightness, meaning that they will be suitably fit for purpose and use by both Christian Dior’s staff and customers.<

Speak to our friendly, expert team

Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.


    By submitting your details you confirm that you agree to the storing and processing of your personal data by Newton Waterproofing as described in the privacy statement.

    We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.