Newton System 500 used to waterproof a road tunnel for conversion into a sporting venue for the 2012 Olympics. The tunnel was affected by severe penetrating damp.
Charmouth Tunnel was constructed in 1831 and was until 1991 used as a road tunnel forming part of the A35. Purchased in 2004 by Clist Properties Ltd, the tunnel was the subject of an ongoing planning dispute. However after many meetings and some legal work a use was approved for the disused tunnel.
The use in question is a training facility for Target sports including archery and shooting, and it will be used as a practice facility for the 2012 Olympics. Additional facilities include a café and shop. The tunnel suffered from severe damp and water penetration into and through the tunnel. The tunnel is covered by 8 metres of soil.
Client: Clist Properties Ltd
Following many months of research and discussions the decision was made to use a membrane which would resolve the damp issues. Clist Properties needed a very high level of technical support as the project was on a budget, and the only way in which they could make it achievable was to carry out much of the work themselves and they needed help.
Newton 508 and 508 Mesh were used to drain water that was entering the structure from above and prevent the associated mineral deposit stalactites forming. The products are ideally suited to this type and shape of structure as the water drains naturally behind the membrane following the arch shape down to specially formed floor gullies at the base of the walls which run the length of the structure. Water then discharges naturally to the open elevation at the low end of the tunnel.
The products are ideally suited to this type and shape of structure as the water drains naturally behind the membrane following the arch shape down to specially formed floor gullies at the base of the walls which run the length of the structure. Water then discharges naturally to the open elevation at the low end of the tunnel.
Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.
We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.