CCL installed Newton Acriflex Winter and Newton NuSeal-LM to a new podium deck/balcony and terrace in Surrey as part of a comprehensive waterproofing system.
Newton Specialist Basement Contractor CCL were commissioned by Redbridge Building Contractors to design, supply and install a comprehensive structural and terrace waterproofing system to their luxury new build property in St Georges Hill in Surrey.
CCL installed the Newton System 500 internal Type C Cavity Drain Membrane system to the Type B reinforced concrete box structure to provide a combined waterproofing solution as recommended for habitable accommodation in accordance with BS8102:2009. The internal drained cavity system offers the ultimate contingency plan to capture any water ingress that may occur through the joints in the concrete structure. CCL installed the Newton Titan-Pro sump system, complete with full battery backup protection.
CCL installed Newton Acriflex Winter as the waterproofing solution to all the interlinked balconies and terraces.
Acriflex is a twin component flexible acrylic waterproofing system which is applied via roller to the mechanically prepared concrete. Once prepared, Newton NuSeal-LM was roller applied in two coats to act as a primer and vapour barrier. The Acriflex was applied and Newton 207 DeckDrain double cuspated drainage membrane was applied over the Acriflex to protect the waterproofing layer and move any water to designated drainage outlets designed within the podium deck structures. To complete the terrace areas stone paviours were laid on a 50mm sand blinding layer.
Acriflex Winter, NuSeal-LM and 207 DeckDrain were ideal for this terrace waterproofing project.
Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.
We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.