Summary

Leafy Windlesham in Surrey was the location for this 5-bedroom, £15,000,000 mansion by Searchfield Homes, complete with a 4-metre deep basement containing a swimming pool and spa pool, all of which needed to be protected from water ingress and ground gases.

The Project

Considering the prestigious nature of the property, the high water table, and the risk from ground gases, Newton Specialist Contractor Maclennan Waterproofing were contacted by the architect to provide a specification combining waterproofing and ground gas remediation, as well as providing an insurance-backed installation guarantee.

The Solution

Maclennan recommended the patented Newton PAC-500 System to protect against both gas and water ingress. The PAC-500 begins as a Newton CDM System by Maclennan’s installers, all of whom have obtained or are working towards their Level 2 NVQ qualification. Newton 508 membrane is installed to the walls and floor, with MultiPlugs to secure it and Waterseal Tape to seal the joints. Water captured by the membrane is then directed via a series of Basedrain and Floordrain channels to a Titan-Pro sump and pump chamber.

During the installation process Maclennan also worked closely with specialist gas remediation contractor Prestige Air in order to convert the CDM System into a Positive Air Curtain (PAC) System too. This was achieved by fitting an air duct behind the membrane at ceiling height around the basement, then using a high volume, low-pressure fan to deliver a curtain of air behind the membrane, blocking gas from entering by creating a continual flow of pressurised air.

The Result

By utilising the specialist expertise of both Maclennan and Prestige Air from an early stage, the architect and client benefited from a combined system that not only protects against both water and gas, but is also compliant with all relevant British Standards and supported by Maclennan’s insurance-backed installation guarantee.

quotation marks

“Newton Waterproofing System’s products were a perfect fit for the specific requirements of this high-value project where there was no room for failure. The specialist PAC system enabled us to comprehensively cover the gas protection requirements, whilst at the same time dealing with the waterproofing too, and all by using one product system from one supplier. ” Ian Scoggins - Senior Surveyor, Maclennan Waterproofing, Newton Specialist Basement Contractor

Speak to our friendly, expert team

Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.


    By submitting your details you confirm that you agree to the storing and processing of your personal data by Newton Waterproofing as described in the privacy statement.

    We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.