This property in a small Cotswolds village suffered regular flooding and prolonged power outage. The combination of the Newton Victron Quattro Inverter and Generator System gives unlimited power during prolonged power outage, so the basement stays dry.
This village in the Cotswolds suffers from weekly power cuts, and when combined with severe weather patterns, flooding is frequent. A previous waterproofing system was inadequately installed in this property and it was unable to cope with the volumes of water during the power outage. As a result flood damage was a major problem.
Newton Specialist Basement Contractor Guardian Preservation were commissioned to provide a specification for a pumping system that would cope with the high volumes of water present during a power outage.
The Victron Quattro Inverter was chosen to provide pumping during power interruption. It works by inverting 12V DC power from a battery (or multiple batteries) to clean and efficient 230V power. Because of the length of the power outage, the client required extra security in the instance that the batteries depleted before the power was restored, which in this particular village was very frequent.
The self-start Generator System was installed and linked to the Victron Quattro Inverter. Two Newton NP750 high performance pumps were installed.
Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.
We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.