Newton System 500 used to waterproof a large basement area as part of a prestigious new-build property in Surrey, installed by Newton Specialist Basement Contractor MacLennanUK.

The Project

A prestigious new-build property in Surrey

This large new-build property in Surrey had a very large basement area which needed to be waterproofed to meet BS 8102 requirements, the British Standard for the Protection of Structures Against Water From the Ground. Because it is not possible to determine the amount of potential water pressure surrounding a structure, BS8102 tells the designer to expect a head of water against the structure. In addition, BS8102 requires that all waterproofing is maintainable and repairable.

The Solution

Newton Specialist Basement Contractor MacLennanUK were commissioned to design and install a Cavity Drain Waterproofing System. Newton System 500 was deemed the best range of products for the project as it provides a maintainable waterproofing solution – and thus meets the requirements of BS8102.

Newton 508 Cavity Drain Membrane was applied to all internal walls, and ingressing water was collected into the Basedrain channels throughout the perimeters of the wall/floor junction and pumped out to safe drainage using the Newton Titan Pro pumping system.

The Result

The property is completely protected against water ingress.

Speak to our friendly, expert team

Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.


    By submitting your details you confirm that you agree to the storing and processing of your personal data by Newton Waterproofing as described in the privacy statement.

    We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.