01732 360 095

HydroBond 914-RT

  • Robust Joint Reinforcement: Effectively strengthens static and covered movement joints when used with HydroBond 108-LM and 109-LM membranes, ensuring long-lasting durability.
  • Precise Detailing for Protrusions: Provides reliable reinforcement around service pipes and other protrusions, enhancing the overall integrity of the waterproofing system.
  • Versatile Compatibility: Non-woven polypropylene tape designed for seamless integration with HydroBond membranes, offering flexibility and ease of application in various scenarios.

Reinforcement Tape for covering protrusions, static joints, and covered movement joints alongside HydroBond 108-LM and HydroBond 109-LM.

Reinforcement Tape for covering protrusions, static joints, and covered movement joints alongside Newton 108 HydroBond-LM and 109-LM.

  • Key Benefits
  • Typical Applications
  • Key Benefits

    Key Benefits

    Used with Newton HydroBond 108-LM and HydroBond 109-LM for:

    • Formation of covered movement joints
    • Detailing around protrusions through the membrane
    • Reinforcing static construction joints

    Typical Applications

    Typical Applications

    A non-woven polypropylene reinforcement tape used with HydroBond 108-LM and HydroBond 109-LM seamless rubber waterproofing membranes, in order to reinforce detailing around protrusions such as service pipes

    HydroSeal 914-RT can also  be used over static construction and day joints and covered movement joints

    Customer Success Stories

    Our latest customer reviews from Feefo - the award winning review platform

    view all reviews

    Speak to our friendly, expert team

    Our staff are able to provide guidance for projects of all sizes, whether you require some general advice about damp or waterproofing, or support with technical drawings and specifications.


      By submitting your details you confirm that you agree to the storing and processing of your personal data by Newton Waterproofing as described in the privacy statement.

      We will be closing between Christmas and New Year, with the last day of operations being Friday 20th December. Last orders for delivery before Christmas therefore need to be placed by 2pm on Thursday 19th December, with final deliveries on Friday 20th December. After this, no deliveries will be possible until January 2025. The Newton branches in Tonbridge and Leeds will reopen in the New Year on Thursday 2nd January 2025.